Installation and positioning
Step 5 - Checks
After installation, check the water discharge for about 1-2 weeks and, if necessary, adjust the system settings by opening (= more water) or closing (= less water). Be gentle because the Tropf-Blumat is sensitive. In most cases the setting will only need to be adjusted by 1/2 a marking arrow.
